Tests are often required to verify that elements of work have been completed to a certain standard – such as compaction tests or concrete strength tests. These tests can occur prior to, during or after execution of the works. Testing requirements are generally specified in the contract documents.
It is usual that such tests are taken by a third party to ensure integrity of the results. To record the tests that have been requested and taken, a system of Test Requests and a method for recording Test Results is required.
Civil pro maintains a Test Request register which provides the capability to record results and generate testing locations randomly. Test Requests are linked back to the relevant lot. |