Lot status |
Top Previous Next |
Civil pro lots can have one of four statuses - Open, Rejected Guaranteed or Conformed.
Conformed Lot A conformed lot is a lot for which all testing has been performed and results received demonstrating compliance, all checklists are completed and any NCRs are closed out.
Guaranteed Lot A guaranteed lot is completed and complies with the specification but is waiting on some results of testing (such as 28 day concrete tests) or other information.
Open Lot A lot which is neither conformed or guaranteed
Rejected Lot When a lot is explicitly marked as rejected
Statusing a lot A lot is
Multiple lots can be rejected, un-rejected, guaranteed, un-guaranteed, conformed or un-conformed by using the functions available from the grid context menu (right click on the grid). For example, to guarantee 5 lots, select them (multi - select using the shft or ctrl keys), right click to get the context menu and select "Guarantee" from the menu.
You will be prompted to reject/un-reject a lot if you assign replacement lots. |