The civil pro alpha (version 9.31.1.13) has been released to testing partners. We currently have 4 companies working with us, but if you are an existing licensed user and would like to participate, please contact us. Please note, that any databases updated to version 9 are permanent and cannot be reverted.
Changelog from previous alpha versions;
- Add pagebreak in ITP Report
- Moved report period selectors to bottom toolbar and simplified for invoice reconciliation
- Changed order of items in project menu, and changed name of change connection to changed database
- Fixed propogation of costcode updates to open daycost / claim forms
- Changed outstanding references from Disposition to Corrective Action for consistency
- created event to update source grid (e.g. lot doc count) after lotdocs added.
- Changed license system to allow for product code validation of domain
- Add/Edit support for items in checklist
- Added claim all for selected function in progress claim
- Drag and drop added for lot quantities
- Added queryextender for test request hasdocs
- Changes to project settings, system setting and user settings – mainly layout and terminology
- Changed permission for substitute supplier function in master suppliers list to sysadmin
- Added checks for inactive suppliers in the notinlist for suppliers
- Added double click behaviour for related NCR in lot reg
- Update grid for HasNCR/HasDoc/HasQty and lot vals in NCR and Lot when related items updated
- References to ‘person’ changed to contact
- Removed redundant npInvoice
- null check on refreshcurrentrow
- changed test req, ncr and atp number to be diabled by default – editable by context menu item
- added totals daycosts, sellatcompletion, paidTTD and djcAtcompletion
- required projectadmin and insert additional warning on report period delete
- added default sort to purchaseorder
- Add To Complete columns to progress claim
- Added ClaimQty – CertQty column
- Added claim reports using cert qty
- changed project settings to bound data source and added GST property
- Changes to autounguarantee code
- Changed approval system to use query extenders – LotITP and NCR
- Updated NCR/Checklist reports to work with query extenders
- Added checks on unapproved NCR, Incomplete tests and unapproved ATPs in lot conformance
- View record in approval view no shows NCR with detail open
- Updating worktype, areacode, controlline etc now calls update on forms with these collections
- New checklist function in mdicChecklist now opens checklist after creation
- Double confirmation of period delete in progress claim – prev comp for invoice and daycost
- Colour coding of related items in treelist for approval
- Added additional columns for unapproved NCRs, unfinished tests, has ATP and unapproved ATP to lot reg
- Added ctrl+” shortcut for new lot like selected
- Fixed exception in transmittals for outstanding users
- Added drag and drop to checklist to change order
- Added capability to add a new item to the checklist
- Changed invoice reconciliation so no filters required
- Added queryextender for hastest in ITP
- Refactored popUpdateClaimSchedule
- Created new dialog for contact entry as opposed to using the user wiz
- Changed size of testreq wizrd to prevent squishing of radio buttons
- Related items are automatically refreshed when form is activated
- Added state maintenance to related items
- Added tooltips to menu items
- Fixed tooltips in context menus
- Replaced references to QVC with checklist for consistency
- Removed ‘altqvctext’ fields from ITPs. This is now managed behind the scenes for custom checklist descriptions
- BUGFIX: in project cleanup that would delete daycosts that don’t have cost codes
- BUGFIX: Fixed popITP so it limits list properly based on sourceobject
- BUGFIX: test request docs were not working. Fixed
- BUGFIX: Generating iTP reports and schedule reports did not always commit existing changes first
- BUGFIX: when moving to new row in ITPDetail an exception was raised for a malformed query
- BUGFIX: Added date required to ATP wizard
- BUGFIX: New test request wizard when called from lot register
- BUGFIX – removed incorrect warning when rebuilding snapshot
- BUGFIX – Activity and Risk registers not persisting project data
- BUGFIX – AllowNCR previously used incorrect constant
- BUGFIX – v30 project update query runs every project start
- BUGFIX: Lot folio – exception in progress claim compile
- BUGFIX: threadsafe datalayer created for backgrounding of lot folio
- BUGFIX: lot number was editable like normal editors
- BUGFIX: changing geometry type did not change geometry pane in dlc
- BUGFIX – Duplicate matching on invoice import
version 9.30.1.10
Civil Pro version 9 – Alpha v9.31.1.10 released
version 9.30.1.9
Civil Pro version 9 – Alpha v9.30.1.9 released
version 9.30.1.8
Civil Pro version 9 – Alpha v9.30.1.8 released